DESIGN & REHABILITATION OF EXISTING METALLED ROAD FROM MASKAN GATE OF KARACHI UNIVERSITY TO PHARMACY DEPARTMENT INTERSECTION, KARACHI UNIVERSITY CIRCULAR ROAD, KARACHI
Under this Assignment, the Consultant shall require undertaking the activities which include:
- Preliminary Study and Proposal for Approval of Road & Gates
- Detail Design & Drawings
- Bid Management
The initial phase shall require the Consultant to carry out survey of the existing road facilities and suggest proposal for improvement in such a manner that proposed road may accommodated the existing and projected traffic load and provide a good and healthy environment. The consultant shall prepare and present for approval of at least three alternatives proposal to the competent authority for approval. The consultant shall also prepare a preliminary cost estimate and feasibility report of the proposals. Subsequently, upon satisfactory completion of the first phase, the Consultant will require to develop a detailed engineering design, and detailed cost estimate based on quantity take off and Preparation of BOQ, specification of material and Bidding Document.
- Institute of Business Administration IBA, Karachi
- On-Going
- 2024