The project involved conducting a detailed survey and preparing a feasibility report for the extension of Naval Berths 5-14 in Karachi. This project involved installing new sheet piles, cope beams, and refurbishing jetty services. including site investigations, software modeling, design, cathodic protection system recommendations, BOQ, Engineer’s Estimates, Technical document preparation, etc.