The project involved carrying out hydrological studies for the existing commercial facility, followed by a reassessment after the built-up area was designed. Based on the updated studies, the drainage design was finalized, underwent the filtration system by discharging into a detention tank for sediment settling, before connecting to the main storm water and sewer network system.