The project involved conducting a feasibility study and detailed design for three packages: Flyover over Tarnol Railway Phattak along with dualization of Tarnol urban area up to Naogazi (6.5 km); Dualization of Naogazi to Fatehjang (28.5 km); and Dualization of Fatehjang to Jand section of N-80 (68 km). The scope of services also included site investigations, analysis, preparation of technical documents and Bill of Quantities.